Surveying at the right time and its consequences

Selectaglaze secondary glazing is proprietary, which when delivered to site is a bespoke complete window with its timber grounds constructed for a specific opening. We manufacture our units to fit within very fine tolerances: 3-5mm each side of the unit, rather than make a unit fit using lots of packers and adding surrounds to hide unsightly gaps. High performing secondary glazing provides both optimal thermal enhancement and noise reducing qualities to the original window opening. Any large gaps between the frame of the secondary glazing and its surround, will allow draughts to pass through or some noise ingress, which defeats the purpose of its installation. Surveying content image The best time to survey an opening to get final measurements prior to the manufacture of the units, is when all the works to the primary windows have been completed. This is why we measure twice –first by a technical advisor to obtain details to design a suitable solution and provide an estimate; then at a later stage, by a surveyor, for production. This measurement will be far more comprehensive, checking for level, plumb and true so that the timber grounds can be specified to ensure the best possible interface with the structure. In many instances where a building is being renovated for change-of-use, plans can evolve throughout the process and change quite dramatically from the initial drafts, having knock-on-effects for us. Such changes can include:
  1. The introduction of raised floors; which can have implications on the specification of glass used in relation to Building Regulations Part K for protection against impact or falling. Sometimes bulkheads are added or blinds have been placed in front of the primary windows in the opening, which could both have a huge impact on the treatment
  2. If an original window is refurbished or rebuilt, the works can change the opening sizes or indeed the treatment
It is not always understood that little changes in one area can have large consequences for another, a 2mm skim of plaster to the reveals of an opening which has already been surveyed can result in very costly remakes and delays to the programmes for the secondary glazing. It is imperative that we work closely with the project managers on site, so that all potential eventualities and consequences can be planned for in the design of the secondary glazing treatment. If we can then gain access to survey at the right point – when all the works to the primary glazing and their surrounds have been completed, then it will facilitate in an optimal installation, which is completed on schedule; making the building – warmer, quieter and safer.

Never miss one bit!

Subscribe to our monthly Newsletter to receive updates on our news and CPD initiatives.

Thank you!

Thanks for joining our mailing list.

Our use of cookies

We use cookies to provide you with a great experience and to help our website run effectively. You can find out more and change your cookie preferences anytime on our Cookie Policy page.